幫助中心 | 我的帳號 | 關於我們

城市軌道交通基於通信的列車運行控制系統<CBTC>互聯互通工程規範第1部分工程設計(T\CAMET04013.1-2018)(英文版)/中國城市軌道交通協會團體標準

  • 作者:編者:中國城市軌道交通協會
  • 出版社:中國鐵道
  • ISBN:9787113315665
  • 出版日期:2024/09/01
  • 裝幀:平裝
  • 頁數:30
人民幣:RMB 105 元      售價:
放入購物車
加入收藏夾

內容大鋼
    本書為《城市軌道交通基於通信的列車運行控制系統(CBTC)互聯互通工程規範第1部分工程設計》英文版。涵蓋工程設計基本要求、各設備布局原則等內容。工程設計基本要求包括分區原則、車載應答器天線和無線天線安裝位置。應答器布局原則涉及屬性描述、安裝精度、軌旁應答器等多種布局要求。信號布局原則包括車輛段/停車場與正線轉換軌道信號、站台信號等各類信號布局。軸計數器布局原則有總體原則及在不同區域的布局原則。還闡述了軸軌道區段長度原則、接近區段相關原則、觸發區段設計原則、保護區段相關原則,包含長度計算、釋放、跨線保護區段劃分等,以及地面保護區段設置原則、邏輯區段和軌道區段劃分原則等,為城市軌道交通CBTC互聯互通工程設計提供了全面規範。

作者介紹
編者:中國城市軌道交通協會

目錄
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and abbreviations
  3.1 Terms
  3.2 Abbreviations
4 Basic requirements for engineering design
  4.1 Principle of section division
  4.2 Installation position of onboard balise antenna
  4.3 Installation position of onboard wireless antenna
5 Layout principle of balise
  5.1 Description of balise attributes
  5.2 Requirements for installation accuracy of balise
  5.3 Layout requirements of trackside balise
  5.4 Layout principle of transfer balise between depot/stabling yard and main line
  5.5 Layout principle of platform accurate stop balise
  5.6 Layout principle of supporting balise for signal
  5.7 Layout principle of section balise
  5.8 Layout principle of infill balise
6 Layout principle of signal
  6.1 Layout principle of transfer track signal between depot/stabling yard and main line
  6.2 Layout principle of platform signal
  6.3 Layout principle of switch protection signal
  6.4 Layout principle of signal in turnback area
  6.5 Layout principle of section signal
  6.6 Layout principle of line terminal signal
  6.7 Layout principle of connecting line signals between different lines
  6.8 Layout principle of signal at the boundary point of interlocking zone
7 Layout principle of axle counter
  7.1 General principle for axle counter layout
  7.2 Layout principle of axle counters for depot/stabling yard and main line transfer track
  7.3 Layout principle of axle counter in platform area
  7.4 Supporting axle counter principle of signal
  7.5 Layout principle of axle counter in switch area
  7.6 Layout principle of axle counter in overlap
  7.7 Layout principle of axle counter in turnback area
  7.8 Layout principle of axle counter in interlocking area boundary
  7.9 Layout principle of line terminal axle counter
  7.10 Layout principle of connecting line axle counter between different lines
8 Length principle of axle track section
9 Relevant principle of approach section
10 Design principle of trigger section
11 Relevant principle of overlap
  11.1 Calculation principle of overlap length
  11.2 Principle of releasing overlap
  11.3 Principle for division of cross-line overlap
12 Principle of setting ground overlap area
  12.1 Setting principle of ZC handover overlap area
  12.2 Setting principle of ATS overlap area

13 Principle for division of logical section
14 Principle for division of track section

  • 商品搜索:
  • | 高級搜索
首頁新手上路客服中心關於我們聯絡我們Top↑
Copyrightc 1999~2008 美商天龍國際圖書股份有限公司 臺灣分公司. All rights reserved.
營業地址:臺北市中正區重慶南路一段103號1F 105號1F-2F
讀者服務部電話:02-2381-2033 02-2381-1863 時間:週一-週五 10:00-17:00
 服務信箱:bookuu@69book.com 客戶、意見信箱:cs@69book.com
ICP證:浙B2-20060032