幫助中心 | 我的帳號 | 關於我們

大壩安全監測設計(英文版)

  • 作者:趙志仁|譯者:任智鋒//湯慧卿//李潤芝//張寧//翁建平等
  • 出版社:黃河水利
  • ISBN:9787550919280
  • 出版日期:2017/12/01
  • 裝幀:平裝
  • 頁數:163
人民幣:RMB 48 元      售價:
放入購物車
加入收藏夾

內容大鋼
    趙志仁著的《大壩安全監測設計》介紹:The book introduces technical problems on dam security observation scientifically. For concrete dam, earth rock dam,bank of near dam region, water conveyance structure, and outlet structure, several plans, are resented. For example,observation item optimizing, test point optimizing, reasonable distribution, and facility selection. Moreover, the bookintroduces security observation designs of seven typical concrete dams and earth rock dams. Then, it shows evaluationof above designs. Based on past experience of dam security observation designs, advanced new technology and meansare generated. Of course, it has tight relationship with practical engineering. As a result, based on the principle(practical, reliable, advanced, economic), design is optimized. Purposes, such as damsecurity observation, gainingprofit, improving technology level of design and construction, could be achieved.
    The book is available for technicians of water resources and hydropower engineering design,  construction,observation, scientific research, operation, management, facility production. Moreover, it could be used for staff ofuniversity as well.

作者介紹
趙志仁|譯者:任智鋒//湯慧卿//李潤芝//張寧//翁建平等

目錄
Chapter 1  Overview
  1.1  General Principle
  1.2  Observation Items
  1.3  Limit Requirements
Chapter 2  Deformation Observation
  2.1  Horizontal Displacement
  2.2  Vertical Displacement
  2.3  Deflection
  2.4  Incline
  2.5  Seam and Crack
Chapter 3  Seepage Monitoring
  3.1  Uplift Pressure
  3.2  Seepage Pressure
  3.3  Pore Pressure
  3.4  Bypass Seepage
  3.5  Underground Water Elevation
  3.6  Seepage Discharge
  3.7  Water Quality Observation
Chapter 4  Stress Monitoring
  4.1  Concrete Stress and Strain
  4.2  Rock Stress and Strain
  4.3  Steel Stress and Strain
  4.4  Free Volume Strain
  4.5  Soil Pressure
  4.6  Temperature
  4.7  Earthquake
Chapter 5  Hydrology and Hydraulics Monitoring
  5.1  Water Level
  5.2  Precipitation
  5.3  Pressure
  5.4  Energy Dissipation
  5.5  Erosion and Deposition
  5.6  Wave
Chapter 6  Automatic Monitoring
  6.1  Basic Requirements
  6.2  Designing Schemes
  6.3  Monitoring System
  6.4  Data Communication
  6.5  Alarm Criterion
Chapter 7  Monitoring Instruments Graphic Symbols
  7.1  Formulating Process
  7.2  Formulating Principle
  7.3  Instructions
  7.4  Symbol Annotation
Chapter 8  Monitoring Design Instances
  8.1  Concrete Dam
  8.2  Earth and Fockfill Dam
  8.3  Design Optimising
References

  • 商品搜索:
  • | 高級搜索
首頁新手上路客服中心關於我們聯絡我們Top↑
Copyrightc 1999~2008 美商天龍國際圖書股份有限公司 臺灣分公司. All rights reserved.
營業地址:臺北市中正區重慶南路一段103號1F 105號1F-2F
讀者服務部電話:02-2381-2033 02-2381-1863 時間:週一-週五 10:00-17:00
 服務信箱:bookuu@69book.com 客戶、意見信箱:cs@69book.com
ICP證:浙B2-20060032