1 Drilling Case 1:Preparation before Spud in 鑽井工況一:鑽前準備 1.1 Dialogues for exploring moving routes 勘察搬遷路線場景對話 1.2 Equipment Move and Installation 設備搬遷與安裝 2 Drilling Case 2:20in Conductor Operation 鑽井工況二:20in導管作業 2.1 Drill 24in hole鑽24in井眼 2.2 Running 20in conductor(welding) 下20in導管(焊接) 2.3 Running 20in conductor(makeup) 下20in導管(上扣) 3 Drilling Case 3:1 7 1/2 in Surface Hole Operation 鑽井工況三:17 1/2 in表層施工 3.1 Preparation before spud in開鑽前準備 3.2 Drilling鑽進 3.3 13 3/8 in casing cementing 13 3/8 in套管固井 4 Drilling Case 4:12 1/4 in Interval Operation 鑽井lT況四:12 1/4 in井段施工 4.1 Drilling abnormally鑽進異常情況 4.2 Making a trip起下鑽 43 Cementing with 95/sin casing 9 5/8 in套管固井 5 Drilling Case 5:The Operation of 81/2 in Hole 鑽井工況五:81/2 in井眼施工 5.1 Drilling 8j/2 in hole鑽進8 1/2 in井眼 5.2 Tripping out and tripping in起下鑽 5.3 Safety conference before the wireline logging 電測前安全工作會議 5.4 7in Casing cementing 7in套管固井 6 Drilling Case 6:Completion 鑽井工況六:完井 6.1 Completion完井 6.2 Detection for the sling,shackle and other lifling equipment繩套、卸扣等吊裝設備等檢測 6.3 The drilling tools inspection鑽具檢測 7 Drilling Case 7:Safety meeting before testing operations 鑽井工況七:試油作業前安全會 7.1 The safety conference before testing perforation 試油射孔前安全會議 7.2 The safety conference before oil testing wilh completion casing試油前(有完井套管)安全會議 8 Drilling Case 8:Drilling Accidents and treatment 鑽井工況八:鑽井事故與解除 8.1 Handling sticking處理卡鑽 8.2 Loss during drilling鑽遇漏失 8.3 Dealing with loss處理漏失 8.4 Fishing tools打撈工具 8.5 Technical discussion on a nozzle plugged 堵水眼技術交流 9 Drilling Case 9:Daily Talk
鑽井工況九:日常生活對話 9.1 A rig manager asking the toolpusher about the employees on the drill floor 平台經理在鑽台上和帶班隊長詢問僱員情況 9.2 Daily inquiry of the rig manager l 平台經理日常詢問1 9.3 Daily inquiry of the rig manager 2 平台經理日常詢問2 9.4 Introduction to income and expenses 收入與支出介紹 9.5 Celebrating festivals僱員過節 9.6 Drainage during rain下雨排水 9.7 Drilling strings management鑽具管理 10 Vocabulary 辭彙表